Product Details:
|
Model Number: | CWD200 | Dimension: | 6000*2200*2200m |
---|---|---|---|
Driling Diameter: | 90-450mm | Mud Pump: | BW250 |
Drilling Depth: | MAX.200 | Weight: | 7100KG |
High Light: | 200 meters crawler drilling rig,water well pneumatic crawler drilling rig,200 meters crawler drilling machine |
200 Meters Pneumatic Crawler Drilling Rig Water Well for Drilling
CWD200 Multi-functional track mounted water well drilling rig is a efficient,multi-function full hydraulic water well drilling rig.It is high efficiency because of having a larger torque of the turntable and is mainly used for water well in industry and agriculture, national defense building foundation, geological exploration, geothermic well and other foundation working, it is popular at home and abroad.
Right elevation | Left elevation | Front elevation |
PRODUCTS SPECIFICATION
Specification | Unit | CWD200 |
Geology drilled | All kind | |
Drilling Type | DTH&Mud Rotary | |
Drill system and operation | Hydraulic | |
Hole Diameter | mm | φ90-φ450 |
Hole Depth | m | 200 |
Rotation Torque | Nm | 4500-6500 |
Rotation Speed | rpm | 0-90 |
Drill pipe diameter | mm | 76/89/102/114 |
Drill pipe length | mm | 3000 |
Max. Feed Speed | M/min | 18 |
Max. Lifting Speed | M/min | 5-12 |
Feed Stroke | mm | 3400 |
Max.Lifting Force | Ton | 14 |
Lifting force of Main Winch(Optional) | T | 4 |
Lifting force of Hoist | Kgs | 1500 |
Lifting Height of Tool Winch | m | 6 |
Engine | ||
Diesel Engine type | YUCHAI | |
Electrical System | Volt | 24 |
Rated Horse power | Kw | 77 |
Compressor required | ||
Compressor type | Rotary Screw/Movable | |
Pressure Required | Mpa | 1.5-2.5 |
Air consumption | m³/min | 15-30 |
Mud Pump(Optional) | ||
Type | Hydraulic | |
Model | BW450 | |
Stroke | mm | 100 |
Displacement | L/min | 450 |
Discharge pressure(Mpa) | Mpa | 5 |
Suction Tube Diameter | mm | 85 |
Discharge Pipe Diameter | mm | 51 |
Foam Pump | Optional | |
Dimension | ||
Net Weight | Kgs | 5400 |
Transportation dimension | mm | 3950*1700*2150 |
Ground Clearance | mm | 300 |
PRODUCT CONFIGURATION
Famous Hydraulic Control Valve | YUCHAI 70KW Engine | High power hydraulic pump |
High Hydraulic Support Leg | Heavy Duty Rubber Crawler | 1.5Ton Hydraulic Tool Winch |
PRODUCTS LOADING
SUCCESSFUL PROJECT
CERTIFACATION
FAQ
Q: Are you original manufacturer?
|
Q: Which payment terms are available to us? | Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.
|
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. |
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP.
|
Q: How long will the delivery time take? | Q: How about after sales service? | Q:Spare Parts When You Need Them |
A: Normally products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.
|
A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours." |
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.
|
>> Related Products
Contact Person: Ms. Sekura Yu
Tel: +8613811398425
Fax: 86-10-57159802