A JRC300 reverse circulation drilling rig has been delivered to a customer in Central Asia after modifications and an on-site factory inspection. The inquiry was received on September 26, and the customer took delivery on October 14 following customs clearance.

The customer was looking for an RC drilling rig with a maximum drilling depth of 300 meters. With a JRC300 available in stock, our team reviewed the required modifications with the customer before starting work.

After receiving the deposit on September 29, we began preparing the accessories and modifying the rig to the agreed requirements.

latest company news about Fast Response Takes JRC300 from Inquiry to Delivery in Just 9 Working Days  0

Factory Inspection and Shipment

The customer visited our factory on October 7, during China’s National Day holiday, to inspect and test the machine. Following the inspection, the customer approved the rig and completed the balance payment on October 8.

Our team then arranged shipment with the freight forwarder, and the rig was loaded onto a truck on the afternoon of October 9. We also prepared and provided the documents required for customs clearance.

The JRC300 arrived at its destination in Central Asia on October 14, completed customs clearance and was handed over to the customer.

latest company news about Fast Response Takes JRC300 from Inquiry to Delivery in Just 9 Working Days  1

JRC300 Specifications

The JRC300 supports reverse circulation hammer drilling and conventional direct circulation drilling. Key specifications include:

  • Maximum drilling depth: 300 m
  • Drilling methods: DTH and reverse circulation (RC)
  • Rotation torque: 4,800–9,600 N·m
  • Engine: 74 kW Cummins diesel engine
  • Support system: Four hydraulic support legs
  • Undercarriage: Crawler chassis

Having the rig in stock allowed modification work to begin promptly after the deposit was received. Coordination between the workshop, customer and freight forwarder kept inspection, dispatch and customs documentation moving through to delivery.