Send Message
Home ProductsPortable Water Well Drilling Rig

200 Meters Trailer Core CE Water Well Drilling Rig Machine

Customer Reviews
JCdrill---The best and Specilized "one-stop selection sourcing platform“ for drilling rig and tools. —— Orlan

—— Orlan

The trailer water drilling rig TWD200 is really good borehole machine,beasy operation,high efficiency and good price. —— Кочетков Юрий

—— Кочетков Юрий

The hydraulic rotary water well drilling rig JKS300,JKCS400 drilling by DTH hammer and mud pump,very good quality and considerate after sales service!

—— Mr. Mohammed Seif

We start use the JK580 DTH rock drilling rig since 2009,now we have 6set working in our customer's mining site,perfect machine with reasonable price.

—— Gocha Rostiashvili

I'm Online Chat Now

200 Meters Trailer Core CE Water Well Drilling Rig Machine

200 Meters Trailer Core CE Water Well Drilling Rig Machine
200 Meters Trailer Core CE Water Well Drilling Rig Machine 200 Meters Trailer Core CE Water Well Drilling Rig Machine

Large Image :  200 Meters Trailer Core CE Water Well Drilling Rig Machine

Product Details:
Place of Origin: China (Mainland)
Brand Name: JCDRILL
Certification: ISO9001,CE
Model Number: JXY200
Payment & Shipping Terms:
Minimum Order Quantity: 1set
Price: Negotation
Packaging Details: Nude
Delivery Time: Negotiable
Payment Terms: T/T, Western Union, D/A, D/P, MoneyGramm,L/C
Supply Ability: 3000sets/year

200 Meters Trailer Core CE Water Well Drilling Rig Machine

Description
Brand: JCDRILL Condition: New
Power Type: Diesel Weight: 1950kg
Warranty: 1year Hole Depth: 200m
Drilling Angle: 0-90° Hole Diameter: 75-500mm
High Light:

200m water well drilling rig

,

200m core drill rig

,

CE water well drilling rig machine

200 Meters Trailer Type Water Well Drilling Rig/Core Drilling Machine

1. The trailer mounted water well drilling rig is equipped with wheel running gear and hydraulic oil cylinder

pillar, transferring, convenient and easy to drill horizontal adjustment.

2. With hydraulic feed mechanism, improve drilling efficiency.

3. Advanced hydraulic system design makes the control handles concentrated, compact layout

reasonable, easy operation, flexible and reliable; Can realize remote speed change, more humanization

operation

200 Meters Trailer Core CE Water Well Drilling Rig Machine 0

Specification

Max.Drilling depth m 200
Max.Drilling Dia. mm 500
Max.Open hole Dia. mm 500
End hole Dia. mm 75
Drilling rod mm 42,50,60
Drilling angle   0-90°
Rotary Spindle
Spindle forward speed r/min 64,128,287,557
Spindle stroke mm 450
Spindle inner diameter mm 62
Spindle lifting capacity Kg 6000
Spindle Max.Torque N/M 2400
Main Winch (Hydraulic)
Single line lifting speed m/s 17,35,75,151
Tightrope diameter mm 12
Hoist single line lifting capacity Kg 1800
Roller diameter mm 245
Roller cubic measure m 70
Tools Winch
Tightrope diameter mm 6
Roller diameter mm 140
Roller cubic measure m 450
Drilling rig Power(choose one between the following two)
Diesel engine kw/hp 16.13/22
Electric motor KW 15
Trailer
Loading Capacity T 2.5
Weight&Size
Weight kg 1950
Dimension mm 3300×1700×2500

Certification

200 Meters Trailer Core CE Water Well Drilling Rig Machine 1

Delivery

200 Meters Trailer Core CE Water Well Drilling Rig Machine 2

FAQ

Q: Are you original manufacturer? Q: Which payment terms are available to us? Q: Which Incoterms 2010 terms can we work?

A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.

 

 

A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.

A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP.

 

 

Q: How long will the delivery time take? Q: How about after sales service?

Q:Spare Parts When You Need Them

 

A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.

 

 

A: 365×24 Year-round Service
We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours."

A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.

 

About us
200 Meters Trailer Core CE Water Well Drilling Rig Machine 3

 

 

 

Contact Details
Beijing Jincheng Mining Technology Co., Ltd.

Contact Person: Ms. Sekura Yu

Tel: +8613811398425

Fax: 86-10-57159802

Send your inquiry directly to us (0 / 3000)